Tuesday, 4 June 2013

Site Visit Report

Site Visit to Regional Sewage Treatment Plant Penampang
By: Student of UTMSPACE (SKAW) KOTA KINABALU LEARNING CENTRE
Lecturer: DR. MOHD FADHIL BIN MD DIN

11 MAY 3013


Introduction to Regional Sewage Treatment Plant

Regional Sewage Treatment Plant Under Kota Kinabalu Sewerage Scheme Phase 1, Penampang By-Pass is fully operated and maintained under Jabatan Kerja Raya.

The proposed scope of work for Kota Kinabalu Sewerage Phase 1 involves the provision of sewer networks 20,000 metre, refurbishment of existing pump stations and construction of a new regional sewage treatment plant (RSTP Penampang). The project cost for Kota Kinabalu Sewerage Phase 1 is RM183,335,000.00.


THE AERIAL VIEW OF RSTP PENAMPANG- the open space is a proposed to develop Phase 2 unit.

The RSTP is located at Jalan Pintas and the area is about 22.296 acres. The RSTP can cater up to 300,000PE including the future extension projected up to year 2020. The RSTP can have 4 Intermittent Decant Extended Aeration (IDEA) tanks with each tank serving 75,000PE. Under phase 1 only 1 IDEA tanks will be constructed.

The objective of sewage treatment is to produce a disposable effluent without causing harm to the surrounding environment and also prevent pollution.




THE LOCATION OF RSTP PENAMPANG

The objective of sewage treatment is to produce a disposable effluent without causing harm to the surrounding environment and also prevent pollution.


2 comments:

  1. Saya berminat dgn study area ni..boleh saya minta the full report..

    ReplyDelete
  2. Great tips and very easy to understand. This will definitely be very useful for me when I get a chance to start my blog.
    cervical dystonia exercises

    ReplyDelete